ГОСТ Р 55993—2014
stand-alone operation
stand-alone photovoltaic system
standard
standard operating conditions
standard test conditions
standby toss
state of charge
steady-state type solar simulator
storage sub-system
string
string cable
string inverter
sub-array
3.3.521)
3.3.70
3.3.62n)
3.7.25
3.4.16d)
3.4.83
3.4.16e)
3.4.84
3.4.85
3.4.86
3.5.8c)
3.5.10
3.3.72
3.3.75e)
3.3.73
3.2.29
3.2.15,)
3.2.30
3.3.74
3.9.6
3.3.75
3.2.31
3.2.32
sub-contractor
sub-system
supply cable
support structure
system
system efficiency
system output energy
system power
system producer
3.3.76
3.4.26П)
3.4.87
3.4.88
3.4.89
3.7.26
т
tandem photovoltaic cell
temporal simulator instability
test
test and calibration procedures manual
test conditions
test Irradlance
test method
test sequence
testing
testing laboratory
testing laboratory (third party)
textured surface
thermal cycling test
thin film photovoltaic cell
third-party certification
3.1.91)
3.1.63
3.5.11
3.7.32
3.7.27
3.4.16f)
3.4.90
3.6.25»)
3.6.42
3.7.31
3.7.33
3.7.28
3.7.11a)
3.7.29
3.7.30
3.7.11b)
3.1.65
3.6.15k)
3.6.43
3.1.9m)
3.1.66
3.7.6d)
3.7.34
77